148.5 CY · $47,362
Continuous strip footings, 5" slab-on-grade w/ WWF, thickened equipment pads
Material: $27,472 · Labor: $19,890
Sheets S1.01, S2.04 · 6% waste buffer verified
Below is a real-format multi-trade takeoff and bid summary produced from plan sheets and CSI specifications. Review the unit-class checks, exclusions, and audit citations below — then run 3 free bids on your own PDFs (no credit card required).
Every row separates material vs. labor, enforces exact dimensional units, and preserves drawing citations so estimators can challenge or override any line item before sealing.
Continuous strip footings, 5" slab-on-grade w/ WWF, thickened equipment pads
Material: $27,472 · Labor: $19,890
Sheets S1.01, S2.04 · 6% waste buffer verified
3-5/8" metal framing + Type X gypsum partitions (10 ft), ACT ceilings, LVT flooring
Material: $54,820 · Labor: $63,400
Sheets A1.01, A6.01 · Door/finish schedules reconciled
Exam room lavatories, clinical sinks, copper DWV/domestic branch & water heater
Material: $31,200 · Labor: $36,900
Sheets P1.01, P3.01 · Fixture count cross-checked vs. arch
2 packaged 12.5-ton RTUs, 14 VAV boxes w/ reheat, galvanized duct & TAB allowance
Material: $69,400 · Labor: $54,150
Sheets M1.01, M4.01 · Crane pick & structural curb flagged
400A distribution upgrade, parallel EMT feeders, LED exam lighting & fire alarm
Material: $74,900 · Labor: $61,200
Sheets E1.01, E4.01 · Switchgear lead time qualification noted