HVAC & Mechanical Takeoff Guide: Duct Pounds, Fittings, and Equipment Curbs

By BidForge Team

Turning mechanical schedules and floor plans into clean quantities

Commercial Division 23 bids touch sheet metal gauges, lined vs. unlined ductwork, chilled/hot-water piping, controls integration, cranes, and testing & balancing (TAB). Treating fittings as a flat guess leaves thousands of dollars on the table.

Core mechanical takeoff checks

  • Equipment schedule parity: Match every RTU, VAV box, exhaust fan, and louver on the schedule against plan callouts so unlisted tags do not slip through.
  • Ductwork gauge & pressure class: Group rectangular and spiral duct separately by SMACNA pressure class (2 in, 4 in, 6 in WG) and insulation spec (external wrap vs. double-wall).
  • Fittings, transitions, and flex: Track elbows, tees, fire/smoke dampers, and VAV flex connections (EA) explicitly instead of burying them inside straight LF.
  • Roof curbs, structural dunnage & crane picks: Confirm whether structural steel roof frames and rigging belong to Division 23 or Division 05.
  • Commissioning & TAB: Separate third-party Testing, Adjusting & Balancing as an explicit line item (LS) tied to spec section 23 05 93.

Faster first-pass counts without sacrificing estimator control